Skip to Page Content
Delaware.gov  |  Text OnlyGovernor | General Assembly | Courts | Elected Officials | State Agencies
 Photo: Featured Delaware Photo
 
 
 Phone Numbers Mobile Help Size Print Email

Temporary Route Restrictions

     


Restricted Route Name Restricted Route Description
CONCORD POND RD (CR516) Vicinity: SEAFORD

CONCORD POND RD is closed between CHURCH RD and GERMAN RD.

Projected Completion Date: 12/24/2017
CR413
( HYETTS CORNER ROAD)
Vicinity: MIDDLETOWN

HYETTS CORNER RD CLOSED between ST GEORGES HIGH SCHOOL and WINDSOR COMMONS WAY as part of the U.S. Route 301 Mainline Project.

Detour: JAMISON CORNER RD - 896 - 13

Start Date: 03/01/2017 Projected completion date: 12/31/2018
FREDERICA RD (SOUTH) Vicinity: FREDERICA

FREDERICA RD (South) is closed between MARKET ST and SR1.

Detour: Use FREDERICA RD (North) overpass at Exit 86/SR1.

Projected Completion Date: 12/31/2017
HAY RD (CR 501) Vicinity: WILMINGTON

HAY RD will be closed between 12TH ST and LIGHTHOUSE RD to replace a bridge over Shellpot Creek.

Projected Completion Date: June 30, 2018
HOWELL SCHOOL RD (CR54) Vicinity: Glasgow

HOWELL SCHOOL RD to close on May 8, 2017 between RC PEOPLES BLVD and BUCK JERSEY RD.

Proposed Completion Date: 12/22/2017
I 295 SB Ramp To US13 Vicinity: NEW CASTLE

The US13 Exit from 295SB is restricted to loads with a maximum width of 10 feet.

Detour: 295 - 9 - MEMORIAL DR - 13

Projected Completion Date: 5/31/18
I295 SB Ramp to I495 NB Vicinity: NEW CASTLE

The I495 NB Exit from 295SB is restricted to loads with a maximum width of 13 feet.

Detour: 295 - 9 - TERMINAL AVE - 495

Projected Completion Date: 5/31/18
I295 SB Ramp to I95 NB Vicinity: NEW CASTLE

The I95 NB Exit from 295SB is restricted to loads with a maximum width of 13 feet.

Detour: 295 - 95 SB - 58 - 7 - 95 NB

Projected Completion Date: 5/31/18
I95 NB RAMP TO SR141 NB Vicinity: Newport

I 95 NB RAMP to 141 NB is CLOSED to all traffic.

Projected Completion Date: 12/29/17
Interstate 295
(Between US 13 and Interstate 95/Interstate 495)
Vicinity: NEW CASTLE

Due to construction of a new ramp at JCT 13/295 and I-295 widening thru Southbound/Westbound movement on Interstate 295 has a Maximum Vehicle / Load WIDTH restriction of 21 feet.

Detour: 295 - 9 - TERMINAL AVE - 495 - 95

Projected completion date: 5/31/2018
Interstate 295SB
Delaware
Memorial Bridge
Effective 6/15/2016 - Oversize permitted moves can now cross the Delaware Memorial Bridge using Interstate 295SB.

Effective 8/2/2017 - BAN for Overweight moves remains in effect until at least December, 2017.
JIMTOWN RD (CR285A) Vicinity: LEWES

JIMTOWN RD closed between SR23 and ROBINSONVILLE RD.

Projected Completion Date: 6/30/2018
RATLEDGE RD (CR460) Vicinity: TOWNSEND

RATLEDGE RD is closed between DEXTER CORNER RD and SUMMIT BRIDGE RD.

Proposed Completion Date: 12/7/2017
SR 896 ( Boyd s Corner Road) Boyds Corner Road between Ratledge Road and Jamison Corner Road is restricted to 26 foot width
SR 896 NIGHT TIME CLOSURE SR 896 to close nightly between US 301 and US 13 beginning at 8PM lasting to 6AM.

SR141 (BASIN RD) Vicinity: NEW CASTLE

SR141 Northbound and Southbound will be closed over US13 for bridge deck replacement beginning October 2, 2017.

Detour: Suggest SR273.

Projected Completion Date: 11/30/2017
SR141 NB and SB
(Over Interstate 95)
Vicinity: NEWPORT

Due to construction of a new Bridge Deck on SR141 thru movement both NB and SB has a Maximum Vehicle / Load WIDTH restriction of 10 foot.

Start Date: 4/11/2016 Projected completion date: Until further notice
US 301 (MIDDLETOWN WARWICK RD) Vicinity: Middletown

US 301 Northbound and Southbound is restricted to a maximum width of 12' between SR 299 (W MAIN ST) and SR 896 (BOYDS CORNER RD).

Loads exceeding 12' in width are suggested to enter and exit DE from or to MD on SR 300 (SUDLERSVILLE RD)

Proposed Completion Date: January 1, 2018
US13 (SUSSEX HWY) Vicinity: SEAFORD

US13 Southbound will be restricted to a maximum width of 10 feet over Williams Pond beginning 11/28/2017.

Detour: 13 - 16 - 113 - 9 - 13

Projected Completion Date: TBD
US13 SB Ramp to I295 SB Vicinity: NEW CASTLE

The I295 SB Exit from US13 SB is restricted to loads with a maximum width of 10 feet.

Detour: Use 495

Projected Completion Date: 5/31/18
WILSON RD (CR244) Vicinity: GEORGETOWN

WILSON RD will close 11/9/2017 to resurface the railroad crossing located between US113 and DONOVANS RD.

Detour: N BEDFORD ST - DONOVANS RD

Projected completion Date: 11/19/2017
about this site   |    contact us   |    translate   |    delaware.gov