BENGE RD (CR253)
|
Vicinity: HOCKESSIN
BENGE RD closed between CREEK RD and MEETING HOUSE RD for bridge deck replacement.
Projected Completion Date: 5/4/2018
|
CARR RD (CR213)
|
Vicinity: WILMINGTON
CARR RD is closed between WASHINGTON ST EXT and the 95NB OFF RAMP.
Projected Completion Date: 6/30/2018
|
CLAPHAM RD (CR27)
|
Vicinity: LITTLE HEAVEN
CLAPHAM RD is closed between SR1 and BUFFALO RD. This closure will on affect travel from SR1 to CLAPHAM RD. CLAPHAM RD to SR1 SB and SR1 SB to CLAPHAM RD will remain open.
Projected Completion Date: 5/23/2018
|
CR413 ( HYETTS CORNER ROAD)
|
Vicinity: MIDDLETOWN
HYETTS CORNER RD CLOSED between ST GEORGES HIGH SCHOOL and WINDSOR COMMONS WAY as part of the U.S. Route 301 Mainline Project.
Detour: JAMISON CORNER RD - 896 - 13
Start Date: 03/01/2017 Projected completion date: 12/31/2018
|
FREDERICA RD (SOUTH)
|
Vicinity: FREDERICA
FREDERICA RD (South)
A portion of FREDERICA ROAD between MARKET ST and SR1 is restricted to truck traffic. Loads proceeding to ROUTE 1 use FREDERICA RD (North)to access northbound and southbound Route 1
Projected Completion Date: 10/31/2018
|
HAY RD (CR 501)
|
Vicinity: WILMINGTON
HAY RD will be closed between 12TH ST and LIGHTHOUSE RD to replace a bridge over Shellpot Creek.
Projected Completion Date: June 30, 2018
|
I 295 SB Ramp To US13
|
Vicinity: NEW CASTLE
The US13 Exit from 295SB is restricted to loads with a maximum width of 10 feet.
Detour: 295 - 9 - MEMORIAL DR - 13
Projected Completion Date: 5/31/18
|
I-295 NB (Delaware Memorial Bridge)
|
Vicinity: New Castle
295NB is restricted to an individual axle weight of 20,000 pounds.
Detour: For Northern and Central NJ; 495 - 95 - DE/PA LINE or Southern NJ; Cape May/Lewes Ferry.
Projected Completion Date: 12/31/2018
|
I295 SB Ramp to I495 NB
|
Vicinity: NEW CASTLE
The I495 NB Exit from 295SB is restricted to loads with a maximum width of 13 feet.
Detour: 295 - 9 - TERMINAL AVE - 495
Projected Completion Date: 5/31/18
|
I295 SB Ramp to I95 NB
|
Vicinity: NEW CASTLE
The I95 NB Exit from 295SB is restricted to loads with a maximum width of 13 feet.
Detour: 295 - 95 SB - 58 - 7 - 95 NB
Projected Completion Date: 5/31/18
|
I95 NB RAMP TO SR141 NB
|
Vicinity: Newport
I 95 NB RAMP to 141 NB is CLOSED to all traffic.
Projected Completion Date: 5/31/18
|
Interstate 295 (Between US 13 and Interstate 95/Interstate 495)
|
Vicinity: NEW CASTLE
Due to construction of a new ramp at JCT 13/295 and I-295 widening thru Southbound/Westbound movement on Interstate 295 has a Maximum Vehicle / Load WIDTH restriction of 21 feet.
Detour: 295 - 9 - TERMINAL AVE - 495 - 95
Projected completion date: 5/31/2018
|
Interstate 295SB Delaware Memorial Bridge
|
Effective 6/15/2016 - Oversize permitted moves cannot cross the Delaware Memorial Bridge using Interstate 295SB.
Effective 8/2/2017 - BAN for Overweight moves remains in effect until at least December 31, 2018
|
JIMTOWN RD (CR285A)
|
Vicinity: LEWES
JIMTOWN RD closed between SR23 and ROBINSONVILLE RD.
Projected Completion Date: 6/30/2018
|
SR 100 (N DUPONT RD)
|
Vicinity: ELSMERE
N DUPONT RD closed at the EAST PENN RAILROAD between FAULKLAND RD and NEW RD beginning February 5, 2018.
Projected Completion Date: 8/6/2018
|
SR14 MEDIAN (NE FRONT ST)
|
Vicinity: MILFORD
The median crossover for SR14 from or to SR1 Northbound, is closed to all traffic.
Projected Completion Date: 4/24/2018
|
SR141 NB and SB (Over Interstate 95)
|
Vicinity: NEWPORT
Due to construction of a new Bridge Deck on SR141 thru movement both NB and SB has a Maximum Vehicle / Load WIDTH restriction of 10 foot.
Start Date: 4/11/2016 Projected completion date: Until further notice
|
SR18 (CANNON RD)
|
Vicinity: BRIDGEVILLE
SR18 to close March 29, 2018 between SR404 and CAMP RD.
Detour: 13 - 404; 404 - 13.
Projected Completion Date: 4/27/2018
|
US 301 (MIDDLETOWN WARWICK RD)
|
Vicinity: Middletown
US 301 Northbound and Southbound is restricted to a maximum width of 12' between SR 299 (W MAIN ST) and SR 896 (BOYDS CORNER RD).
Loads exceeding 12' in width are suggested to enter and exit DE from or to MD on SR 300 (SUDLERSVILLE RD)
Proposed Completion Date: 9/30/18
|
US13 SB Ramp to I295 SB
|
Vicinity: NEW CASTLE
The I295 SB Exit from US13 SB is restricted to loads with a maximum width of 10 feet.
Detour: Use 495
Projected Completion Date: 5/31/18
|