Skip to Content Skip to Navigation
Delaware.gov logo

Delaware Department of Transportation

Oversize / Overweight Permit System

Temporary Route Restrictions


OSOW Temporary Restrictions

Restricted Route Name Restricted Route Description
BENGE RD (CR253) Vicinity: HOCKESSIN

BENGE RD closed between CREEK RD and MEETING HOUSE RD for bridge deck replacement.

Projected Completion Date: 6/16/2018
CARR RD (CR213) Vicinity: WILMINGTON

CARR RD is closed between WASHINGTON ST EXT and the 95NB OFF RAMP.

Projected Completion Date: 8/31/2018
CR413
( HYETTS CORNER ROAD)
Vicinity: MIDDLETOWN

HYETTS CORNER RD CLOSED between ST GEORGES HIGH SCHOOL and WINDSOR COMMONS WAY as part of the U.S. Route 301 Mainline Project.

Detour: JAMISON CORNER RD - 896 - 13

Start Date: 03/01/2017 Projected completion date: 12/31/2018
FIRETOWER RD (CR108) Vicinity: FELTON

FIRETOWER RD closed between BERRYTOWN RD and C&D CENTER RD.

Proposed Completion Date: 7/4/2018
FREDERICA RD (SOUTH) Vicinity: FREDERICA

FREDERICA RD (South)

A portion of FREDERICA ROAD between MARKET ST and SR1 is restricted to truck traffic. Loads proceeding to ROUTE 1 use FREDERICA RD (North)to access northbound and southbound Route 1

Projected Completion Date: 10/31/2018
HAY RD (CR 501) Vicinity: WILMINGTON

HAY RD will be closed between 12TH ST and LIGHTHOUSE RD to replace a bridge over Shellpot Creek.

Projected Completion Date: 6/30/2018
I 295 SB Ramp To US13 Vicinity: NEW CASTLE

The US13 Exit from 295SB is restricted to loads with a maximum width of 10 feet.

Detour: 295 - 9 - MEMORIAL DR - 13

Projected Completion Date: 7/15/2018
I-295 NB (Delaware Memorial Bridge) Vicinity: New Castle

295NB is restricted to an individual axle weight of 20,000 pounds.

Detour: For Northern and Central NJ; 495 - 95 - DE/PA LINE or Southern NJ; Cape May/Lewes Ferry.

Projected Completion Date: 12/31/2018
I295 SB Ramp to I495 NB Vicinity: NEW CASTLE

The I495 NB Exit from 295SB is restricted to loads with a maximum width of 13 feet.

Detour: 295 - 9 - TERMINAL AVE - 495

Projected Completion Date: 7/15/2018
I295 SB Ramp to I95 NB Vicinity: NEW CASTLE

The I95 NB Exit from 295SB is restricted to loads with a maximum width of 13 feet.

Detour: 295 - 95 SB - 58 - 7 - 95 NB

Projected Completion Date: 7/15/2018
I95 NB RAMP TO SR141 NB Vicinity: Newport

I 95 NB RAMP to 141 NB is CLOSED to all traffic.

Projected Completion Date: 7/15/2018
Interstate 295
(Between US 13 and Interstate 95/Interstate 495)
Vicinity: NEW CASTLE

Due to construction of a new ramp at JCT 13/295 and I-295 widening thru Southbound/Westbound movement on Interstate 295 has a Maximum Vehicle / Load WIDTH restriction of 21 feet.

Detour: 295 - 9 - TERMINAL AVE - 495 - 95

Projected completion date: 7/15/2018
Interstate 295SB
Delaware
Memorial Bridge
Effective 6/15/2016 - Oversize permitted moves cannot cross the Delaware Memorial Bridge using Interstate 295SB.

Effective 8/2/2017 - BAN for Overweight moves remains in effect until at least 12/31/2018
JIMTOWN RD (CR285A) Vicinity: LEWES

JIMTOWN RD closed between SR23 and ROBINSONVILLE RD.

Projected Completion Date: 6/30/2018
SR 100 (N DUPONT RD) Vicinity: ELSMERE

N DUPONT RD closed at the EAST PENN RAILROAD between FAULKLAND RD and NEW RD beginning February 5, 2018.

Projected Completion Date: 8/6/2018
SR14 (NE FRONT ST) Vicinity: MILFORD

NE FRONT ST closed between SR1 and REHOBOTH BLVD.

Proposed Completion Date: 8/1/2018
SR141 NB and SB
(Over Interstate 95)
Vicinity: NEWPORT

Due to construction of a new Bridge Deck on SR141 thru movement both NB and SB has a Maximum Vehicle / Load WIDTH restriction of 10 foot.

Start Date: 4/11/2016 Projected completion date: 12/31/2018
SR141 SB Ramp to I95 NB Vicinity: NEWPORT

SR141 Southbound Ramp to I95 Northbound will be closed on 6/25/2018 and 6/26/2018 for repairs and improvements.

DETOUR: Use 7 to access I95 during this timeframe.
SR2 Ramp To SR141 SB Vicinity: ELSMERE

SR2 Ramps to SR141 Southbound will be closed 6/20/2018 and 6/21/2018. Please use NEWPORT GAP PIKE to connect 2 and 141 during this time period.
SR30 (GRAVEL HILL RD) Vicinity: MILTON

SR30 closed at Bridge 3807 248, between HUFF RD and SHINGLE POINT RD.

Projected Completion Date: 8/1/2018
SR5 (HARBESON RD) Vicinity: HARBESON

HARBESON RD to close on June 11, 2018 between US9 and HOLLYVILLE RD to resurface RR Crossing.

Projected Completion Date: 6/20/2018
SR72 (SUNSET LAKE RD) Vicinity: NEWARK

SR72 is closed between BROADLEAF DR and GBC DR.

Proposed Completion Date: 8/27/2018
SR72 (WRANGLE HILL RD) Vicinity: BEAR

SR72 will close at the Railroad Crossing on 7/6/2018 between SR71 and PORTER RD.

Proposed Completion Date: 7/15/2018
TERMINAL AVE (CR359) Vicinity: WILMINGTON

TERMINAL AVE will be closed 6/22/2018 at the Railroad Crossing between PIGEON POINT RD and CHRISTINA AVE

Detour: HEALD ST to CHRISTINA AVE in either direction.

Proposed Completion Date: 7/19/2018
US 301 (MIDDLETOWN WARWICK RD) Vicinity: Middletown

US 301 Northbound and Southbound is restricted to a maximum width of 12' between SR 299 (W MAIN ST) and SR 896 (BOYDS CORNER RD).

Loads exceeding 12' in width are suggested to enter and exit DE from or to MD on SR 300 (SUDLERSVILLE RD)

Proposed Completion Date: 9/30/2018
US13 SB Ramp to I295 SB Vicinity: NEW CASTLE

The I295 SB Exit from US13 SB is restricted to loads with a maximum width of 10 feet.

Detour: Use 495

Projected Completion Date: 7/15/2018
WESTVILLE RD (CR52) Vicinity: CAMDEN WYOMING

WESTVILLE RD to close 6/11/2018 between ALMSHOUSE RD and MOOSE LODGE RD.

Projected Completion Date: 7/20/2018


 ADA Information
+