INFORMATION

Project Limits

US 40 and SR 896 in Glasgow

Project Need

This intersection is in need of both safety and operational improvements. The US 40 Corridor Monitoring Program shows large peak hour volumes and substantial congestion. Traffic conditions will likely deteriorate further with proposed development in the area.

Project Overview

The purpose of this project is to improve safety and operations at the intersection of US 40 and SR 896 through geometric improvements, with the potential for a grade separated interchange. Project Timeline: Currently we are in the very preliminary data gathering/project scoping process. Once we have gathered all of the necessary information, we will begin the NEPA process and begin developing our alternatives.

Project Timeline:

As part of the NEPA process, we have evaluated several alternative that will address the purpose and need of the project. Three alternatives were retained that will be shown at the public workshop to be held May 1st. Please see below flyer for more information.

Information Flyer


(Reviewed and Updated on 04/12/2018)