Bridge Maintenance

Bridge Work
Bridge repair work on bridge damaged by the Seaford flood in 2006


This would include various work on bridges along I-495, I-95 and in other locations. Work includes painting, approach slab replacement/repairs, overlay of decks, repair of expansion joints and bearings, repair of spalled concrete and replacement of deck and substructure.


$9.4 million to start. Another $11 million in work could be moved forward if more ARRA funding becomes available.


Maintenance of bridges is a priority as it's a significant step in ensuring these bridges are in satisfactory condition, and do not fall into the structurally deficient category.