Project Limits:

This bridge is located in the Rivers End subdivision off of SR 7 in Bear.

Project Need:

The pipe crossing under the road is rapidly deteriorating due to rust and must be replaced.

Project Overview:

This project involves the replacement of two large corrugated metal pipe arches with reinforced concrete pipes. The approach roadways will be reconstructed as needed and riprap will be placed in the stream for scour protection. The work will be performed under a full road closure with a detour.

Project Timeline:

Design Phase:

Complete

Construction Phase:

Construction work to begin in Spring/Summer 2018


(Reviewed and Updated on 11/20/2017)