Project Limits:

On US 13 between the intersection of Middelford Road and SR 20 (Norman Eskridge Hwy)

Project Need:

The existing joints are in poor condition and there are spalls and delaminations in the backwall. The substructure requires minor repairs and the deck is showing signs of cracking. Replacing the joints, repairing the substructure, and sealing the deck will extend the life of the bridge.

Project Overview:

This project involves the rehabilitation of Bridge 3-253 N&S. The scope of work includes replacing the abutment back-walls, removing deck joints and installing link slabs over the joints, replacing the bearings, sealing concrete, cleaning and painting of steel members, and repair of cracks and spalls in the concrete piers and abutments.

Project Timeline:

Design Phase:

Design work is complete

Construction Phase:

Construction should start in Spring 2017
Construction Completion: Summer 2017

(Reviewed and Updated on 2/22/2017)