INFORMATION

Project Limits:

Spring Lake Drive to Church Street

Project Need:

There is significant delamination of the deck and damage to the approach slabs due to settlement. Several of the beams are misaligned, abutments and piers have significant spalls and need repair. There is also guardrail damage and the joints need replacement.

Project Overview:

The project involves the replacement of the concrete deck on Bridge 3-150S and deck patching on Bridge 3-150N. Additional work includes replacing the approach slabs, correcting the vertical alignment, replacing the joints, replacing the bearings, realigning the beams, repairing concrete spalls throughout the substructure, and sealing the concrete abutments and piers.

Project Timeline:

Design Phase:

Design work will be completed no later than Winter 2019

Construction Phase:

Construction work will be complete by Spring 2020

Additional Comments

This project will be designed in consultation with a General Contractor familiar with this type of work. Emphasis will be placed on reducing time of construction and impact to traffic. Work impacting traffic on SR1 will be performed outside the summer peak tourist season.

(Reviewed and Updated on 2/22/2017)