Project Limits:

300 feet North and South of the bridge

Project Need:

The existing bridge consists of two corrugated aluminum pipes that are significantly corroded at the waterline with areas of 100% section loss throughout. The existing pipes are structurally deficient and were selected by the Pontis Bridge Management System for replacement.

Project Overview:

This project involves the placement of a structural concrete liner on the interior of the existing corrugated aluminum pipes. Additional work includes road resurfacing and the placement of riprap as a scour countermeasure. The work will be performed under lane shifts.

Project Timeline:

Design Phase:

Design work to be completed no later than June 2017.

Construction Phase:

Construction work to be completed no later than November 2017.

Additional Information:

Project Work Area
There will be no detour available for this project. Red Mill Road will be open to through traffic for the duration of the project. One lane of the roadway will be closed. Traffic will be directed by flaggers in the opposing, open lane.