Project Limits:

Approximately 300 feet West and 300 feet East of the bridge.

Project Need:

The existing structure consists of three corrugated metal pipe. The replacement of Bridge 2-275A has been proposed due to significant corrosion found during routine bridge inspections and the subsequent diminishing structural integrity of the structure.

Project Overview:

The scope of the proposed project is to replace the existing corrugated metal pipes with reinforced concrete pipes. Additional improvements include minor approach roadway work and placing rip-rap in the stream for scour protection. The work shall be performed under a full road closure with a posted detour.

Project Timeline:

Design Phase:

Design work is completed.

Construction Phase:

Construction work to be completed no later than Summer 2016.



(Reviewed and Updated on 4/13/16)