Project Limits:

Approximately 250 feet east and west of the bridge along Nine Foot Road

Project Need

There is significant corrosion at the waterline with 100% section loss at several locations throughout the pipes. The existing pipes are structurally deficient and were selected by the Pontis Bridge Management System for work.

Project Overview:

Replace the existing two corrugated aluminum pipes with a precast box culvert. Place riprap for scour protection. Reconstruct approaches and place guardrail as necessary. Work will be performed under a full road closure with detour for traffic.

Project Timeline:

Design Phase:

Design work to be completed no later than Summer, 2018.

Construction Phase:

Construction work to be completed no later than Spring, 2019.



(Reviewed and Updated on 08/28/2017)