This is identified in the Highway Safety Improvement Program (HSIP) site C in 2008. The project is designed with the following goals in mind:

  • Improve intersection and corridor safety and operation
  • Improve drainage
  • Improve bicycle facilities

Project Overview:

Project improvements include:

  • Improve safety at intersections by reducing conflict points
  • Convert Church Road to one-way to eliminate turning movements
  • Signalize Old Porter road at SR 71 to minimize unprotected movements and reduce delays.
  • Increase level of service of intersection of SR 7 at SR 71 by adding dedicated turn lanes and installing protected-only left-turn phasing
  • Improve drainage and roadside safety by removing concrete ditches and installing pipes.

Anticipated Start Date:

Project is underway

Anticipated Completion Date:

Summer 2018