Date Impact Location Condition Map It
04/04/2014
to
04/22/2014
Restriction Arrow Safety Road and Springfield Road Intermittent lane restrictions (daytime) for crack sealing. View Map
03/31/2014
to
05/09/2014
Closure Central Avenue between Fred Hudson Road and Cedar Drive The road will be closed at 9 a.m. on Monday, March 31 for the relocation of the sewer main force. The roadway is anticipated to be open at 6 a.m. on Friday, May 9, pending weather. Detour routes will be posted for motorists. View Map
04/14/2014
to
05/09/2014
Restriction Cullen Bridge (Bridge over the Indian River Bay) on Route 1 northbound and southbound Intermittent sidewalk closures from 9 a.m. until 5 p.m. on the northbound side of the bridge on Monday, April 21 through Thursday, April 24; and from 9 a.m. until 3 p.m. on Friday, April 25.

Daytime right lane and shoulder closures on Route 1 southbound beginning on Monday, April 28 through Thursday, May 8.

Inspection of the bridge.
View Map
03/25/2014
to
05/06/2014
Restriction East Trap Pond Road at Whaleys Corner Road/West Piney Grove Road intersection Intermittent lane closures from 9 a.m. until 3 p.m., Monday through Friday for the installation of warning flashers, loops and new ground mounted signs at the intersection. Flaggers will be on site to control traffic. View Map
04/17/2014
to
04/17/2014
Restriction Fred Hudson Road Intermittent lane restrictions (daytime) for crack sealing. View Map
04/07/2014
to
04/25/2014
Restriction Friendship Road; Indian Misson Road; Stevenson Road; Harmons Hill Road; Phillips Branch Road; Holly Lake Road (Millsboro); Hurdle Ditch Road (Harbeson); and Harbeson Road (Harbeson) Inspection of storm drains from 6:30 a.m. to 5 p.m. Monday through Friday. View Map
02/27/2014
to
04/17/2014
Closure Garfield Parkway eastbound and westbound between Route 1 and Pennsylvania Avenue The road will be closed at 6 a.m. on Thursday, February 27 for road reconstruction. The roadway will reopen by 6 p.m. on Thursday, April 17, pending weather. Detour routes will be posted for motorists. View Map
04/09/2014
to
05/09/2014
Restriction Garfield Parkway south side from Pennsylvania Avenue to Atlantic Avenue On-going work to construct the sidewalk and ADA curb ramps, and lighting. View Map
04/14/2014
to
05/31/2014
Closure Nine Foot Road (Bridge over Wharton Branch Ditch) between Revel Road and Blueberry Lane The road will be closed at 6 a.m. on Monday, April 14 for the replacementof the existing metal pipe arches with a precast concrete box culvert. The road will reopen by 7 a.m. on Saturday, May 31, pending weather.

Local detour for light trucks, cars, farm equipment: Raspberry Road to Blueberry Lane. Posted Detour: Route 113 northbound to Millsboro Highway westbound and return to Nine Foot Road.
View Map
12/03/2012
to
06/20/2014
Restriction Route 1 and Route 30 Grade Separated Intersection (Milford) Construction of overpass to resume on Monday, April 21. View Map
04/22/2014
to
05/30/2014
Restriction Route 1 at Sea Colony intersection 9 a.m. until 3 p.m., Monday through Friday until May 15-full signal rebuild without impact to traffic. After May 15, work will be 9 a.m. until 3 p.m., Monday through Thursday until May 30. View Map
04/04/2014
to
05/26/2014
Restriction Route 1 from James Street to Route 54 AND Route 54 from Route 1 to west of Lincoln Street (Fenwick Island) Intermittent lane and shoulder closures from 9 a.m. until 3 p.m. Monday through Friday, beginning Friday, April 4 and ending Thursday, May 15.

New schedule on May 19 until May 26. The work hours will be from 9 a.m. until 3 p.m. Monday through Thursday. Intermittent lane and shoulder closures are necessary for fiber optic work.
View Map
04/25/2014
to
04/28/2014
Restriction Route 113 and College Park Drive intersection (Georgetown) Daytime intermittent lane closures on Friday, April 25 for the new signal activation. New signal will go into full Stop and Go operation on Monday, April 28, after rush hour. View Map
04/11/2014
to
04/30/2014
Restriction Route 113 southbound at College Park Lane intersection Intermittent lane closures from 8 a.m. until 6 p.m. for construction work at intersection. View Map
03/03/2014
to
10/24/2014
Restriction Route 13 at Route 20/Stein Highway AND Route 13 at Middleford Road intersections (Route 13 Seaford Improvements Project) Nighttime lane closures from 8 p.m. until 5 am. for the addition of turn lanes, modifications to islands and medians. View Map
03/24/2014
to
05/15/2014
Restriction Route 13 southbound (Bridgeville Wawa) Daytime lane closures for median improvements. View Map
04/07/2014
to
04/25/2014
Restriction Route 16 (Ellendale/Milton); Omar Road (Frankford); and Redden Road (Bridgeville/Milton) Lane or shoulder closures may take place from 6:30 a.m. until 5 p.m. for the inventory/inspection of storm drains. View Map
03/24/2014
to
04/18/2014
Restriction Route 16 at Route 5/Union Street intersection (Milton) Intermittent lane closures in all directions from 9 a.m. until 3 p.m., Monday through Friday for rebuild of intersection and new mast arm signal. Flaggers will be on site to direct motorists. View Map
01/09/2014
to
09/01/2016
Restriction Route 26, Atlantic Avenue from Clarksville to Assawoman Canal (T200411210.01-Route 26 Widening Project) Monday, April 14 through Friday, April 18.

Continue work on sewer force main relocation revision at Central Avenue and Route 26. Central Avenue may continue to remain closed to thru traffic at Route 26. Central Avenue will remain open to local traffic only between Fred Hudson Road and Route 26 and between Cedar Drive and Route 26. Motorists that wish to cross Route 26 using Central Avenue are advised to follow the posted alternative routes.

Periodic lane closures on Route 26 associated with the sewer force main relocation may occur during this week between Woodland Avenue and West Avenue. Motorists should anticipate the eastbound lane of Route 26 to be closed with traffic alternating utilizing a flagging operation between 9 a.m. until 5 p.m.

Continue underground utility relocation work along the south side of Route 26 from Powell Farm Road to Route 17/Roxanna Road. Motorists should anticipate the eastbound lane of Route 26 to be closed between Route 17/Roxanna Road and Powell Farm Road with traffic alternating utilizing a flagging operation between 9 a.m. until 5 p.m.

Continue removal of items located within the right-of-way, multiple locations along the project. No lane closures are anticipated for this work

Begin installation of storm drain system between Old Mill Road and Grants Avenue. Motorists should anticipate the eastbound or westbound lane of Route 26 to be closed between Old Mill Road and Grants Avenue with traffic alternating utilizing a flagging operation between 9 a.m. until 5 p.m.

Overhead utility relocation work will continue at various locations from Powell Farm Road to Route 17/ Roxanna Road. Motorists should anticipate utility construction along the westbound shoulder of Route 26 from Route 17/Roxanna Road to Powell Farm Road. No lane closures are anticipated for this work.

Monday, April 21 through Friday, April 25.

Continue work on sewer force main relocation revision as needed at Central Avenue and Route 26. Central Avenue may continue to remain closed to thru traffic at Route 26. Central Avenue will remain open to local traffic only between Fred Hudson Road and Route 26 and between Cedar Drive and Route 26. Motorists that wish to cross Route 26 using Central Avenue are advised to follow the posted alternative routes.

Continue underground utility relocation work along the south side of Route 26 from Powell Farm Road to Route 17/Roxanna Road. Motorists should anticipate the eastbound lane of Route 26 to be closed between Route 17/Roxanna Road and Powell Farm Road with traffic alternating utilizing a flagging operation between 9 a.m. until 5 p.m.

Begin installation of storm drain system between Old Mill Road and Grants Avenue. Motorists should anticipate the eastbound or westbound lane of Route 26 to be closed between Old Mill Road and Grants Avenue with traffic alternating utilizing a flagging operation between 9 a.m. until 5 p.m.

Overhead utility relocation work will continue at various locations from Powell Farm Road to Route 17/ Roxanna Road. Motorists should anticipate utility construction along the westbound shoulder of Route 26 from Route 17/Roxanna Road to Powell Farm Road. No lane closures are anticipated for this work.

Mobilize for sewer force main relocations along the shoulder of westbound Route 26 between the Assawoman Canal and Town Drive. No lane closures are anticipated for this work.

Mobilize for sanitary sewer installation between Route 17/Roxanna Road and the Millville Town Limits. No lane closures are expected for this work.
View Map
01/13/2014
to
12/31/2014
Restriction Route 9 and Hudson/Fisher Road intersection; Route 9 and Dairy Farm Road intersection; and Route 9 and Route 30/Gravel Hill Road intersection Widening and adding addtional turn lanes at these intersections to improve driver safety and reduce accident rates. At this time, traffic is begin shifted without any lane closures. If needed, lane closures will occur from 6 p.m. until 7 a.m. Monday through Friday. View Map
03/31/2014
to
05/15/2014
Restriction Route 9 eastbound/westbound (Schell Brothers: The Vineyards at Nassau Valley) Daytime lane shifts for road construction widening. View Map
04/11/2014
to
04/30/2014
Restriction Route 9 from Route 13 to Route 113 Intermittent lane closures from 9 a.m. until 3 p.m., Monday through Friday for hot-mix patching. Flaggers will be on site to direct traffic. View Map
04/08/2014
to
05/02/2014
Closure Woodland Ferry The Woodland Ferry is currently out of service. View Map