Project Title
BR 3-142 ON S571 ADAMSVILLE ROAD OVER SHORT & HALL DITCH
Description
This project involves the replacement of the existing pipes with three 6-foot diameter reinforced concrete pipes. The approach roadways will be reconstructed as needed and riprap will be placed in the stream for scour protection. The work will be performed under a full road closure with a detour.
Justification
There is significant corrosion at the waterline with 100% section loss at several locations throughout the pipes. The existing pipes are structurally deficient and were selected by the Pontis Bridge Management System for work. The bridge has been load posted for 3 tons.
Advertise Date
06/24/2013
Bid Amount
$241,200.90
Bids Received Date
07/23/2013
Bid Tabulation Report
View PDF Report
Date Awarded
08/14/2013
Total Project Cost
$337,120.95
First Chargeable Day
09/30/2013
Contractor
ZACK EXCAVATING INC
Actual Completion Date
10/31/2013
Bond Information
Company Name
INTNTL FIDELITY INS CO
Address
2570 BLVD OF THE GENERALS
STE 125
NORRISTOWN PA 19403
Attorney Name
RUSSELL C TESTER
Attorney Company Name
 
Attorney Address
22 N CHURCH ST
WEST CHESTER PA 19380
Attorney Phone Number
6104364608
Bond Number
0523388
Payment Information
Est No Header Detail Status Est Amt Payment Type Advice No Advice Date
1 [View] [View] Interim $133,083.90 EFT 273513 11/08/2013
2 [View] [View] Interim $104,137.79 EFT 282523 12/12/2013
3 [View] [View] Interim $3,353.52 EFT 289705 01/14/2014