Project Information [T201200102]

This information is updated nightly.
Recently awarded projects may not contain the awarded contractor or bid amount information.
This information can be found at the bottom of the bid tabulation report, which is updated as projects are awarded.

Project Information
Project Number
T201200102
Federal Aid Number
ESTP-N031(07)
Project Title
HEP, SR 7 AT SKYLINE DRIVE / MERMAID STONEY BATTER ROAD INTERSECTION I
Description
Proposed Improvement: The following improvements to address operational and safety deficiencies at the SR 7 at Skyline Drive intersection and the uncontrolled pedestrian crossings along Skyline Drive are recommended: - Increase the length of the northbound and southbound left-turn lanes approaching Skyline Drive by 200 feet and 300 feet, respectively, and install protected-only left-turn phasing on the northbound and southbound SR 7 approaches to Skyline Drive/Mermaid Stoney Batter Road. - Extend the sidewalk along the north side of Skyline Drive from approximately 120 feet west of SR 7 to SR 7, remove the two uncontrolled crosswalks across Skyline Drive, and install a signalized crosswalk across the west leg of SR 7 at Skyline Drive/Mermaid Stoney Batter Road.
Justification
The following peak hour observations were noted at SR 7 at Skyline Drive/Mermaid Stoney Batter Road: - Northbound and southbound SR 7 through queues frequently block access to the turn lanes and occasionally southbound left-turn queues extend beyond the southbound left-turn lane. - One to two southbound SR 7 left-turning motorists turn each cycle during the yellow and all-red intervals at the end of the northbound/southbound SR 7 through phase (i.e., "sneakers"). - The longest northbound and southbound left-turn queues were 12 and 16 vehicles, respectively. - Southbound left-turn sight distance is restricted to 290 feet when opposing left-turning vehicles are present, which does not satisfy the American Association of State Highway and Transportation Officials (AASHTO) criteria.
Advertise Date
12/09/2013
Bid Amount
$733,057.26
Bids Received Date
01/14/2014
Bid Tabulation Report
View PDF Report
Date Awarded
02/12/2014
Total Project Cost
$1,019,840.45
First Chargeable Day
05/27/2014
Contractor
GREGGO & FERRARA INC
Estimated Completion Date
05/28/2014
Bond Information
No bond information is available.
Payment Information
Est No Header Detail Status Est Amt Payment Type Advice No Advice Date
1 [View] [View] Interim $42,937.94 EFT 337403 06/18/2014
2 [View] [View] Interim $278,733.98 EFT 348921 08/07/2014
3 [View] [View] Interim $122,284.46 EFT 357623 09/09/2014