Project Information [T201107305]

This information is updated nightly.
Recently awarded projects may not contain the awarded contractor or bid amount information.
This information can be found at the bottom of the bid tabulation report, which is updated as projects are awarded.

Project Information
Project Number
T201107305
Federal Aid Number
ESTP-S618(01)
Project Title
BR 3-906 ON S618 EVERGREEN LANE OVER HAVEN LAKE, MILFORD
Description
This project involves the replacement of the existing corrugated metal pipes with three 5-foot diameter reinforced concrete pipes. Additional work includes minor reconstruction of the approach roadway, installation of guardrail as needed, and placement of riprap in the stream to prevent scour. The work will be performed under a full road closure with detour.
Justification
There is significant corrosion at the waterline with 100% section loss at several locations throughout the pipes. The existing pipes are structurally deficient and were selected by the Pontis Bridge Management System for work. This bridge was ranked 47th on the 2010 DelDOT Bridge Deficiency List.
Advertise Date
03/11/2013
Bid Amount
$173,026.16
Bids Received Date
04/09/2013
Bid Tabulation Report
View PDF Report
Date Awarded
05/01/2013
Total Project Cost
$362,940.10
First Chargeable Day
09/03/2013
Contractor
A DEL CONSTRUCTION CO INC
Actual Completion Date
11/09/2013
Bond Information
No bond information is available.
Payment Information
Est No Header Detail Status Est Amt Payment Type Advice No Advice Date
1 [View] [View] Interim $25,718.00 EFT 267762 10/21/2013
2 [View] [View] Interim $104,555.75 EFT 277802 11/25/2013
3 [View] [View] Interim $98,516.34 EFT 290894 01/17/2014
4 [View] [View] Semi-final $2,980.76 EFT 338106 06/19/2014