| CATEGORY |
FORM NO.  |
FORM TITLE |
| CONCRETE |
LB-1 |
Concrete Truck Inspection |
| LB-2
|
Concrete Plant Report |
| LB-3
|
Inspection and Calibration of Batching Equipment (Water) |
| LB-4
|
Concrete Plant Production Report |
| LB-5
|
Calibration Data Sheet for Volumetric Batching and Continuous Mixing |
| LB-6 |
Core Drill Report |
| LB-7 |
Supplementary Core Drill Report (Deficient Thickness) |
| LB-8 |
Air and Slump History |
| LB-9
|
Concrete Ticket |
| LB-10
|
Daily Plant / Personnel Report |
| LB-11
|
Compression Test Report |
| LB-12
|
Moisture Content of Fine & Coarse Aggregate |
| HMA |
LB-21 |
Asphalt Plant Lab Inspection Checklist |
| LB-24 |
Bituminous Concrete Plant Activity Report |
| LB-26 |
Gyratory Method |
| LB-29 |
Box Sample Tag |
| LB-30 |
Box Sample Worksheet |
| LB-36 |
Asphalt Sample Tag |
| LB-37 |
Drilled Core Worksheet |
| SOILS & AGGREGATES |
LB-40 |
Proposed Borrow Pit |
| LB-41 |
Soil Survey Worksheet |
| LB-42 |
Soil Analysis Summary |
| LB-43 |
Boring Log Worksheet |
| LB-44 |
Soil Analysis Report |
| LB-45 |
Specific Gravity of Soils |
| LB-48 |
Moisture-Density Relationship |
| LB-50 |
Fine Aggregate Report |
| LB-51 |
Specific Gravity and Absorption of Fine Aggregate Worksheet |
| LB-58 |
Specific Gravity and Absorption of Coarse Aggregate Worksheet |
| LB-59 |
Coarse Aggregate Report |
| SHARED |
LB-60 |
Pavement Core Field Worksheet |
| LB-61 |
FieldControl Ticket |
| LB-62 |
Air and Slump Report |
| LB-63 |
Drilled Core Report |
| LB-64 |
Bridge Deck Survey Field Worksheet |
| LB-65 |
Hot-mix Request for Compaction Waiver |
| LB-65B |
Structural Coring Evaluation Worksheet |
| LB-66 |
Contract Pretest Summary |
| LB-67 |
Sample Tag |
| LB-68 |
Summary of Field Density Tests |
| LB-69 |
Inspection and Calibration of Batching Equipment |
| CHEMICAL |
LB-70 |
Asphalt Binder Report |
| LB-71 |
Emulsified Asphalt Cement Report |
| LB-72 |
Cut-Back Asphalt Cement Report |
| LB-74 |
Asphalt Hot Mix Plant Field Sample - Monthly Summary |
| LB-75 |
Contract Asphalt Field Sample - Monthly Summary |
| LB-76 |
Portland Cement, Type 1 Report |
| LB-77 |
Blended Cement Report |
| LB-78 |
Slag Report |
| LB-79 |
Fly Ash Test Report |
| LB-80 |
Silica Fume Report |
| LB-81 |
Water Test Report |
| LB-82 |
Latex Modifier for Concrete |
| LB-83 |
Concrete Admixture |
| LB-84 |
Rapid Chloride Permability Report |
| LB-85 |
Bridge Deck Chlorides |
| LB-86 |
Aggregate Reactivity Report |
| LB-87 |
Concrete Core ASR Report |
| LB-88 |
Traffic Marking Paint |
| Misc. Construction |
LB-90 |
Reinforcing Steel Report |
| LB-92 |
Reinforced Concrete Pipe Report |
| LB-95 |
Brick Test Form |
| LB-97 |
Seed Sample Tag |
| LB-100 |
Materials Inspection Report |
| IA |
LB-110 |
I.A. Soil Density and Sample Comparison Sheet |
| LB-111 |
I.A. Graded Aggregate Base Course Comparison Sheet |
| LB-112 |
I.A. Concrete Test and Sample Comparison Sheet |
| LB-113 |
Independent Assurance Evaluation |
| PROCEDURE CHECKS |
LB-130 |
Air Content of Freshly Mixed Concrete by the Volumetric Method Performance Checklist |
| LB-131 |
Making and Curing Concrete Test Specimens in the Field |
| LB-132 |
Slump of Hydraulic Cement Concrete Performance Checklist |
| LB-133 |
Sampling Freshly Mixed Concrete Performance Checklist |
| LB-134 |
Air Content of Freshly Mixed Concrete by the Pressure Method Performance Checklist |
| LB-135 |
Temperature of Freshly Mixed Concrete Performance Checklist |
| LB-136 |
Nuclear Gauge: Procedures and Equipment Check |
| LB-137 |
Maximum Specific Gravity of Bituminous Paving Mixtures Performance Checklist |
| LB-138 |
Determining the Asphalt Content of Hot Mix by the Ignition Method Performance Checklist |
| LB-139 |
Determining Density of Hot Mix Asphalt Specimens by Means of the Gyratory Compactor |
| LB-140 |
Mechanical Analysis of Extracted Aggregate Performance Checklist |