While the alternatives being considered as part of the US 113 North/South Study are long-term improvements, DelDOT is also making short-term improvements to help improve the local traffic conditions now.

DelDOT has implemented short-term improvements underway at the following intersections along the US 113 corridor:

  • US 113/SR 18 & SR 404 (Georgetown)
  • US 113/SR24 (Millsboro)

US 113/SR 18 & SR 404

The intersection of US 113 at SR 18/SR 404 in Georgetown currently operates at a substandard level of service during both the summer and non-summer peak hours. To improve operations prior to implementation of the long-term recommendations of the US 113 North/South Study, DelDOT evaluated short-term improvements at this intersection.

The following capacity improvements were recommended based on an input from the Georgetown Area Working Group:

  • Convert the exclusive right-turn lane on the westbound SR 18/SR 404 approach to a shared through/right turn lane.
  • Modify the medians and directional islands to accommodate concurrent left-turns for the SR 18/SR 404 approaches. The modifications require full-depth pavement patching.
  • Upgrade the traffic signal equipment to accommodate concurrent SR 18/SR 404 phases.
  • Install pavement striping as required by the modifications.
  • Modify curb ramps in accordance with ADA standards.
The above improvements were included in a recent DelDOT contract to improve several roadways in Sussex County and are currently being built:
US113 Project Logo
Project Information
 
Public Feedback
Public Relations This link opens an email client
302.760.2080
800.652.5600 (DE only)

Monroe Hite, III, P.E. This link opens an email client
Project Manager
302.760.2120
 
Last Updated: Friday, 21-Aug-2009 11:50:16 Eastern Daylight Time
site map   |   about this site   |    contact us   |    translate   |    delaware.gov