Short-Term Improvements
While the alternatives being considered as part of the US 113 North/South Study are long-term improvements, DelDOT is also making short-term improvements to help improve the local traffic conditions now. DelDOT has implemented short-term improvements underway at the following intersections along the US 113 corridor:
US 113/SR 18 & SR 404 The intersection of US 113 at SR 18/SR 404 in Georgetown currently operates at a substandard level of service during both the summer and non-summer peak hours. To improve operations prior to implementation of the long-term recommendations of the US 113 North/South Study, DelDOT evaluated short-term improvements at this intersection. The following capacity improvements were recommended based on an input from the Georgetown Area Working Group:
|
|