SR 52 & SR 82 Intersection Improvements

Project Name

HSIP NCC SR 52 & SR 82 Intersection Improvements

Project Limits

About 800 feet North of the intersection along SR52.
About 1100 feet South of the intersection (not passing Sunnyside Rd) along SR52.
About 600 feet East of the intersection (Up to Brookmeadow Rd) along Kirk Road.
About 400 feet West of the intersection along SR 82/Campbell Road.

Project Need

This intersection was placed in the Highway Safety Improvement Program (HSIP) due to the high rate of accidents as compared to other sites throughout the State. Over a four-year study period January 2004 - September 2008 a total of 73 accidents were reported.

Project Overview

This project requires milling, overlaying and restriping the northbound and southbound SR 52 approaches to the SR 82/Campbell Road/Kirk Road intersection to provide a left-turn lane, a through lane and a right turn lane. This will also require reconstructing SR 52 shoulders and SR 82/Campbell Road/Kirk Road pavement edge. In order to better manage the drainage in the area curb and gutter will be placed along SR 52 and a ditch will be placed along the North side of Kirk Road.

Project Schedule (Based upon available funding)
Design Phase: Summer 2008 - Winter 2009
Construction Phase: Fall 2010 to Winter 2011 (Anticipated)

Project Information
 
Public Feedback
Public Relations This link opens an email client
302.760.2080
800.652.5600 (DE only)

Susan Maldonando This link opens an email client
Project Manager
302.760.2396
 