Project Name HSIP NCC SR 52 & SR 82 Intersection Improvements Project Limits About 800 feet North of the intersection along SR52. Project Need This intersection was placed in the Highway Safety Improvement Program (HSIP) due to the high rate of accidents as compared to other sites throughout the State. Over a four-year study period January 2004 - September 2008 a total of 73 accidents were reported. Project Overview This project requires milling, overlaying and restriping the northbound and southbound SR 52 approaches to the SR 82/Campbell Road/Kirk Road intersection to provide a left-turn lane, a through lane and a right turn lane. This will also require reconstructing SR 52 shoulders and SR 82/Campbell Road/Kirk Road pavement edge. In order to better manage the drainage in the area curb and gutter will be placed along SR 52 and a ditch will be placed along the North side of Kirk Road. Project Schedule (Based upon available funding) |
|