Old Porter Road, Porter Road to SR 71
Project Status
February 18, 2009
The Old Porter Road project includes the construction of bike lanes on both sides of Old Porter Road and the realignment of the Old Porter Road and SR 71 intersection. Concept design was completed in 2005. Final design and construction are not currently funded or scheduled.
Meridian Crossing II, a proposed residential development along Old Porter Road, has been required by DelDOT and New Castle County to fund the reconstruction of a sharp horizontal curve within the project area. This curve has been identified as a significant location where safety improvements are needed. Final design is complete for the curve reconstruction; however, a construction schedule has not been established.