Route 40 Phase 3 Map


























































































Notes:
1 - Costs in millions (1999 dollars). All costs include preliminary engineering, construction, right-of-way acquisition, and ITMS improvements.

2 - Sidepath: A pathway designated for pedestrians and bicyclists that is physically separated from traffic by an open space or barrier. A sidepath is at least 10' wide.

3 - Access Management: Access management limits and/or removes the number of points at which a vehicle may enter or exit a highway. It may include combining entrances and parking lots and adding service roads.

Scheduling and scope of projects is based on the Project Team's best estimate and is subject to change based on results of monitoring

 
Project
Description
Capital Costs1
 
Highway Logo
Intersection Improvements
 
button

Scotland Drive/Route 40

Minor widening and restriping to provide double left turn lanes, a through lane, and a right turn lane for both of the Scotland Drive approaches.
$0.38
button

SR 1 northbound ramp/Route 40

Addition of a second lane to the ramp to provide a two-lane entrance ramp to SR 1 northbound.
$0.55
button Glasgow Avenue/
Route 40
Addition of a southbound through lane, a northbound through lane to provide a left turn lane and through lane, and restriping the eastbound left shoulder for use as a left turn lane. Tied to the Glasgow circulator roadways.
$0.26
   
SUBTOTAL
$1.19
 
curved road logo
Widening of Route 40
 
button Scotland Drive to Salem Church Road Addition of a third through lane in each direction on Route 40 from approximately ¼ mile west of Scotland Drive (tying into the widening constructed in Phase II) to approximately ¼ mile west of Salem Church Road/Porter Road.
$5.37
button Salem Church Road to Church Road Addition of a third through lane in each direction on Route 40 from approximately ¼ mile west of Salem Church Road (tying into the above project) to approximately ¼ mile west of Church Road (tying into the widening constructed in Phase II).
$4.78
button SR 896 to SR 72   Addition of a third through lane in each direction on Route 40 from the proposed ramps of the Route 40/SR 896 interchange to approximately ¼ mile west of SR 72 (tying into the widening constructed in Phase II).
$12.23
   
SUBTOTAL
$22.38
 
Cloverleaf Logo
Interchanges/Grade Separations
 
button Route 40/Route 13 interchange Grade separation of the intersection of Route 40 and Route 13, depending on the recommendations of the Route 13 Corridor Study. Concepts considered by the Steering Committee including taking Route 13 over Route 40.
$6.96
button Route 40 overpass of Norfolk Southern railroad tracks Grade separation, raising Route 40 over the Norfolk Southern tracks.
$15.57
   
SUBTOTAL
$22.53
 
Curved Road Logo
Arterial, Collector, and
Local Road Improvements
button SR 7 (Route 40
to SR 71)
Reconstruction to provide bike lanes and sidewalks along both sides and the reconstruction of the SR 71/SR 7 intersection, including minor realignment as necessary.
$12.70
button SR 72 (Reybold Road to Route 40) Addition of a southbound and northbound through lane and sidewalks along both sides of SR 72.
$20.58
button   Church Road (Wynnfield to SR 71)  Reconstruction to provide bike lanes along both sides.
$7.73
   
SUBTOTAL
$41.01
 
Curved Road Logo
New Roads
 
button Scotland Drive extension to Porter Road Completion of the current dead-end roadway to Porter Road to improve circulation in the area.
$2.68
button   Local Glasgow circulator roadways   Roadway connections and upgrades to improve circulation in the Glasgow area.
$32.56
   
SUBTOTAL
$35.24
 
Bike & Pedestrian logo
Sidepaths2
 
button Route 40 (MD/DE state line to SR 896) Addition of sidepaths along both sides of Route 40.
$7.03
button   Route 40 (SR 1 to
Route 13)
 
Addition of sidepaths along both sides of Route 40.
$6.79
   
SUBTOTAL
$13.82
 
Arrow Logo
Access Management3
 
button Closure of all median openings that are not or will not be signalized Elimination of median openings as Route 40 is widened to reduce conflicts on the newly widened roadway
$0.62
   
Planning Studies
 
    Funding for implementation of planning studies conducted in Phase I.
$20.00
   
Plan Management
 
    Land use monitoring, traffic monitoring, trigger implementation, and Corridor Monitoring Committee involvement.
$0.70
   
PHASE III TOTAL
$ 157.49