Pavement and Rehabilitation Projects Statewide
Rt 273 night time paving operations
Summary:
Initially, DelDOT could put out more than $26.3 million worth of these projects
statewide. This work would be the first to advertise and the first to begin.
Another $11 million in work could be moved on if more ARRA funding becomes
available. The requirement for pave and rehab jobs is that the roads must be
federally eligible, and only 30 percent in Delaware are designated as such. Pave
and Rehab jobs have little to no right of way and design issues and can be bid
quickly. From a jobs perspective, the benefit is that the jobs would be spread
out to many contractors. From an infrastructure perspective, maintaining
roadways before they lapse into disrepair and require a major capital project is
smart and economical in the long run.
Under Construction as of January 29, 2010
Kent County:
- Saulsbury Road from Route 8/Forrest Avenue to Walker Road; North
State Street from Division Street to Walker Road intersection; South
State Street from Loockerman Street to Division Street; Construction
began November 2; The project is currently suspended for the winter.
Work is anticipated to start mid March. The anticipated date of
completion is late April. Contractor Diamond Materials; Project bid
amount $946,018.21; 60 Calendar Day Contract.
Sussex County:
- Johnson Road from Route 113 to Route 1, Issacs Road from Route 16 to
Cedar Creek Road, Hudson Road from West Line Road to Fenwick Road;
Contractor David A Bramble, Inc.; Project bid amount $2,106,256.85; Full
depth reclamation and hot mix full width overlay; Daytime work; Due to
operations sensitive to the weather, the construction will begin in late
April or early May; 70 Calendar Day Contract.
- Rehoboth Boulevard from north of Shawnee Acres to Mispillion Bridge;
Main Street from north Little Creek Road to South Little Creek Road;
Route 13 northbound and southbound from north of Messina Hill Road to
south of Route 42; McCoy Street from east of South Washington Street to
South Walnut Street; Northwest Front Street from west of Church Street
to east side of Washington Street; Marshall Street from north of
Watergate Development to Southeast Front Street; Main Street from Duck
Creek Road to Glenwood Avenue; Millington Road from east of Blackiston
Road to west of Duck Creek Road; Commerce Street from west of Elizabeth
Avenue to West Street; Bay Road, Route 1/Route 113, northbound from
south of New Wharf Road to north of Milford Neck Road; Route 113
northbound and southbound from Haven Lake bridge to Milford Overpass;
and Kings Highway from Route 113 to end of sidewalk on Lakeside Drive.
Construction began on September 14; Due to operations sensitive to the
weather, the construction will resume mid March 2010; Contractor George
& Lynch Inc.; Project bid amount $5,489,626.64; Milling, patching and
hot-mix overlay; Daytime and nighttime work; 240 Calendar Day Contract.
Pavement & Rehabilitation Projects Statewide Completed:
New Castle County:
- East Chestnut Hill Route (Route 4) eastbound and westbound from
South College Avenue (Route 896) to Salem Church Road
- Second Street from King Street to North Broom Street; 16th Street
from Walnut Street to Market Street; King Street from East 16th Street
to East 10th Street; Walnut Street from 13th Street to 16th Street;
South Walnut Street Extension from Rogers Road to Front Street; and
Church Street from Fourth Street to bridge over Brandywine River
- I-95 southbound to DelDOT's salt shed from end of overpass in
Wilmington to end of I-95 Fifth Lane Widening Project
- Route 13 northbound from Port Penn Road to southside of St. Georges
Bridge; and Route 13 southbound from southside of St. Georges Bridge to
Port Penn Road
- New London Road from Covered Bridge Road to Maryland state line;
Greenbank Road from Old Capitol Trail to Route 41; and Main Street in
Newark from railroad tracks to Maryland state line
Sussex County:
- Route 20/Hardscrabble Road from Kaye Road to East Trap Pond Road
- South Walnut Street at City of Milford limits to Northwest Front
Street; Shawnee Road at Blacksmith Shop Road to Fitzgerald Road
|
|
|
|
Last Updated: Friday, 29-Jan-2010 13:47:52 Eastern Standard Time
|