Bridge
Maintenance
Maintenance
![]() Bridge repair work on bridge damaged by the Seaford flood in 2006
Description:
This would include various work on bridges along I-495, I-95 and in other
locations. Work includes painting, approach slab replacement/repairs, overlay of
decks, repair of expansion joints and bearings, repair of spalled concrete and
replacement of deck and substructure.
Cost:
$9.4 million to start. Another $11 million in work could be moved forward if
more ARRA funding becomes available.
Justification:
Maintenance of bridges is a priority as it's a significant step in ensuring
these bridges are in satisfactory condition, and do not fall into the
structurally deficient category.