Project Limits: 200 feet north and south of bridge Project Need This bridge consists of severely corroded corrugated metal pipes (CMPs). As such, it is structurally deficient and was selected by the Pontis Bridge Management System for replacement Project Overview: Replace the deteriorated CMPs with a precast concrete frame. Construction will be completed in one stage with a detour. Reconstruct approaches and place a scour countermeasure in the stream to protect the structure. Current Project Schedule: Design Phase: Design work completed in October 2011. Construction Phase: Construction work to start in May 2012 and be complete within approximately 40 days of beginning. |
|