|
Project Overview Project Number: 24-112-10 This project will make improvements to SR 26 Atlantic Avenue. The existing roadway will be widened to provide one eleven (11) foot lane in each direction with five (5) foot shoulders. A 12 foot center turn lane will be included through the length of the project. Separate Right Turn Lanes will be added at some intersections pending analysis of their warrants and impacts. The Central Avenue intersection will be realigned and separate right turn and left turn lanes will be added. A traffic signal will be installed at West Avenue. Sidewalks and closed drainage will be provided for much of the roadway segments through Ocean View and Millville. The work will make improvements that accommodate the area’s multi-modal transportation needs. DelDOT and its project team will work with neighborhood and community officials, schools, local government leaders, concerned citizens, federal and state environmental and cultural resource agencies, and others to develop plans that meet the diverse needs of the community. DisplaysThe displays were shown at the last SR 26 Advisory Committee Meeting. File sizes vary but some files are large and may require a long download time depending on your network connection speed. We appreciate your patience. * In order to view the file(s) that are saved in Portable Document Format (PDF), you will need to download the free Adobe Acrobat Reader from Adobe Systems. Visitors with visual impairments or limitations can also access a free suite of tools from Adobe Systems to assist in viewing documents in PDF format. |
|

